R T E N E R J I

RT ENERJI

Kirazlı WPP

Kirazlı WPP

Kirazlı Wind Power Plant Project, which belongs to Kiraz Energy Investment, Production, and Trade Inc. operates under the name of RT ENERJI, is located near the Kiraz and Nazilli Districts of İzmir and Aydın provinces, and has an installed power of 53.4 MW.

Installation Date

2021

Location

Kiraz / İzmir ve Nazilli / Aydın TÜRKİYE

Power MW

53.4

WPP

14

Completion Date

2022

Project Summary

Kirazlı WPP Project, which was put into operation in December 2019, has an annual electricity generation capacity of 188 million kWh with 14 turbines and an installed power of 53.4 MW. The Kirazlı WPP Project, which started production at full capacity with the installation of all turbines in September 2020, meets the annual electricity needs of approximately 60,760 people.

Kirazlı Wind Power Plant works in an ecologically and socially sensitive manner and provides approximately 75,000 tons of CO2 emission reduction per year.