Adapazarı Wind Power Plant Project, which belongs to Uygun Energy Investment Production and Trade Inc. operates under the name of RT ENERJI, is located near the Bozuyuk District of Bilecik Province and has an installed power of 92.8 MW.

Installation

2021

Location

Göynük / Bolu , TÜRKİYE

Power MW

98.2

WPP

16

Complete

2022

Project Summary

Adapazarı WPP Project, which was put into operation in May 2021, has an annual electricity production capacity of 280 million kWh and 92.8 MW installed power with 16 turbines. The installation of all turbines was completed in 2022. Adapazarı WPP Project meets the annual electricity needs of approximately 100,000 people at full capacity.

Adapazarı Wind Power Plant operates in an ecologically and socially sensitive manner and provides a reduction of approximately 135,000 tons of CO2 per year.