Şile WPP

Şile WPP

Şile Wind Power Plant Project, which belongs to Cevrim Energy Investment Production and Trade Inc. operates under the name of RT ENERJI, is located near the Silivri District of Istanbul and has an installed power of 50 MW.

Installation

2021

Location

Silivri / Istanbul TURKEY

Power MW

51.2

WPP

16

Complete

2022

Project Summary

The Şile RES Project, which was put into operation in May 2021, has an annual electricity production capacity of 175 million kWh and an installed power of 51.2 MW with 16 turbines. The installation of all turbines was completed in 2022. Şile RES Project meets the annual electricity needs of approximately 56,560 people when it comes into full capacity production.

Şile Wind Power Plant works in an ecologically and socially sensitive manner and provides a reduction of approximately 75,000 tons of CO2e per year.